On contemporary functioning systems, it will trigger a segmentation fault sign becoming despatched to the offending plan. For a lengthy transmission line, these lower losses (and decreased construction price of a DC line) can offset the expense of the expected converter stations at Each and every conclusion. The load Command alerts can eith